DescriPtion
The EGCP-3 8406-113 control is a microprocessor-based generator load control designed for use with a separate
speed control and automatic voltage regulator to provide synchronization, shunt, load and unload.
Coordinate all transitions between EGCP-3 functions to provide smooth operation.
EGCP-3 8406-113 Least Squares function:
Display/keyboard interface for local setup/monitoring
Engine start-stop sequence control
Generator and bus power monitoring
Cell sorting and single cell protection
Engine protection and monitoring
Synchronous instruments include speed, phase, voltage matching, token passing dead bus closure, and multiple unit synchronization
KW control and automatic generator loading and unloading without bumpy load transfer
Droop, base load, isochronous and isochronous load sharing control capabilities
➭Promptly reply you within 24 hours
➭100% quality assurance,1-YEAR WARRANTY
➭Best services,reasonable price
➭Have been in the line for many years,has a good reputation
➭Provide on-going availability of automation replacement parts
◎ Worldwide shipping
*100% full New – Original Factory Seal
* Warranty: 1 Year
* Package: Original packing with cartons.
* Delivery time: Shipped in 3 days after payment
* Ship to you via DHL/TNT/UPS/EMS/Fedex.
* All the goods will be tested before shipment.
✦ About FAQ
Q: Are you a trading company or a manufacturer?
A: Yes, we are a trading company.
Q: Do you have inventory or need to buy from other suppliers?
A: We keep a lot of inventory to sell, and we have our own warehouse.
Q: Do you provide 100% original and new products?
A: Of course. No plagiarism, no counterfeiting, no renovation! Original only! ! !
Q: Do you sell outdated products? Even a very old product?
A: If there is a new model that needs to be replaced, we will recommend you to use the new model;
if it is not easy to replace, we will help check the old one in good condition.
If used or other conditions, we will tell you the truth.
Q: How long is your delivery time?
A: If the goods are in stock, it usually takes 2-3 working days. If the quantity is large,
it will take 5-7 working days after receiving the payment.
If it is not a normal product, it always takes 3-4 weeks or 6-8 weeks to order.
There are no reviews yet.